Project Completion Certificate (Ground Water)
Scheme ID: 20011897 Name of Scheme: TENI No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 5570 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 12-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.95 M/ 101.33 M TENI 27.513307 80.219295
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.3 M³ per Min /45Mtr TENI 27.513307 80.219295
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 16 Mtr TENI 27.513359 80.219288
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.157
2 HDPE Pipe PN-6, Class PE-100 75 9.908
3 HDPE Pipe PN-6, Class PE-100 90 2.203
4 HDPE Pipe PN-6, Class PE-100 110 1.985
5 HDPE Pipe PN-6, Class PE-100 125 0.315
6 HDPE Pipe PN-6, Class PE-100 140 0.594
7 HDPE Pipe PN-6, Class PE-100 160 1.132
8 HDPE Pipe PN-6, Class PE-100 200 2.503
HSC Connection
Sno. Total Nos.
1 966
Other Details
4.25
0.00
4.17
11-Nov-2023
24-Dec-2024