Scheme ID: 20011704 Name of Scheme: Agaulapur No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4280 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 12-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 31 M/ 114.8 M Agaulapur 27.512042 80.297425
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.0 M³ per Min /45Mtr Agaulapur 27.512042 80.297425
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 18 Mtr Agaulapur 27.51202 80.297288
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.0226
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.800
2 HDPE Pipe PN-6, Class PE-100 75 2.803
3 HDPE Pipe PN-6, Class PE-100 90 2.114
4 HDPE Pipe PN-6, Class PE-100 110 2.553
5 HDPE Pipe PN-6, Class PE-100 125 0.012
6 HDPE Pipe PN-6, Class PE-100 160 1.686
7 HDPE Pipe PN-6, Class PE-100 200 2.322
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.84
0.00
3.60
11-Dec-2023
24-Dec-2024