Project Completion Certificate (Ground Water)
Scheme ID: 20011558 Name of Scheme: Sujiya Mau No. of Villages: 4 No. of Habitation Covered: 20
Total Population Covered: 5008 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2023 Actual Date of Completion (Capex): 20-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well-300 11.97/74.08 Sujiya Mau 25.802891 82.594249
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1050/49.20 Sujiya 25.802891 82.594249
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/14 Sujiya Mau 25.802868 82.594374
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.035
2 HDPE PIPE PN-6 140 1.488
3 HDPE PIPE PN-6 110 2.384
4 HDPE PIPE PN-6 90 1.249
5 HDPE PIPE PN-6 75 0.826
6 HDPE PIPE PN-6 63 17.523
HSC Connection
Sno. Total Nos.
1 840
Other Details
3.45
3.38
2.90
20-Jun-2025
21-Jun-2025