| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011558 | Name of Scheme: Sujiya Mau | No. of Villages: 4 | No. of Habitation Covered: 20 |
| Total Population Covered: 5008 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Sep-2023 | Actual Date of Completion (Capex): 20-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well-300 | 11.97/74.08 | Sujiya Mau | 25.802891 | 82.594249 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-25HP | 1050/49.20 | Sujiya | 25.802891 | 82.594249 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300/14 | Sujiya Mau | 25.802868 | 82.594374 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 0.011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.035 | |
| 2 | HDPE PIPE PN-6 | 140 | 1.488 | |
| 3 | HDPE PIPE PN-6 | 110 | 2.384 | |
| 4 | HDPE PIPE PN-6 | 90 | 1.249 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.826 | |
| 6 | HDPE PIPE PN-6 | 63 | 17.523 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 840 |