Scheme ID: 20011518 Name of Scheme: FATTEPUR GAYAND No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 06-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.03/120.36 FATTEPUR GAYAND 27.684097 79.990208
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 1/45 FATTEPUR GAYAND 27.684097 79.990208
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/16 FATTEPUR GAYAND 27.684097 79.990208
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.787
2 HDPE 75 1.894
3 HDPE 90 1.599
4 HDPE 110 2.640
5 HDPE 125 0.43
6 HDPE 160 0.042
7 HDPE 200 0.162
HSC Connection
Sno. Total Nos.
1 799
Other Details
2.92
0.00
2.86
06-Nov-2023
25-Dec-2024