| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011273 | Name of Scheme: PAAKRI | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2420 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Sep-2023 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -1 | 9.50/94.75 | Pakari | 25.901762 | 82.645145 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump -1 | 600/48 | Pakari | 25.901762 | 82.645145 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175/12 | Pakari | 25.90157 | 82.6457 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.0351 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.3 | |
| 2 | HDPE PIPE PN-6 | 140 | 0.786 | |
| 3 | HDPE PIPE PN-6 | 110 | 0.948 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.405 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.727 | |
| 6 | HDPE PIPE PN-6 | 63 | 6.089 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 248 |