Project Completion Certificate (Ground Water)
Scheme ID: 20011236 Name of Scheme: PATHOLI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3880 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 08-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34.52 Mtr / 101.93 Mtr PATHOLI 29.090399 77.56068
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750 LPM / 50 Mtr PATHOLI 29.090399 77.56068
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl / 12 M PATHOLI 29.090399 77.56068
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0223
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.268
2 HDPE 90 0.964
3 HDPE 110 0.741
4 HDPE 180 0.856
5 HDPE 125 0.118
HSC Connection
Sno. Total Nos.
1 773
Other Details
4.29
4.29
2.94
04-Dec-2024
05-Dec-2024