Scheme ID: 20011151 Name of Scheme: ISLAMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 06-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.6/118.78 Islampur 26.8625 83.4668
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 30/40 Islampur 26.8625 83.4668
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Islampur 26.8625 83.4668
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.938 Laying Completed
2 HDPE 75 1.146 Laying Completed
3 HDPE 90 0.297
4 HDPE 110 0.453 Laying Completed
5 HDPE 140 0.149 Laying Completed
6 HDPE 160 0.471
7 HDPE 200 0.477 Laying Completed
HSC Connection
Sno. Total Nos.
1 425
Other Details
2.16
0.00
2.06
04-Jun-2023
10-Jan-2025