Project Completion Certificate (Ground Water)
Scheme ID: 20011083 Name of Scheme: BARHPATI No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2890 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 17-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.15/153.75 bARHPATI 26.8931 83.2742
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/40 bARHPATI 26.8931 83.2742
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/12 bARHPATI 26.8931 83.2742
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.103 Laying Completed
2 HDPE 75 1.837 Laying Completed
3 HDPE 90 .793 Laying Completed
4 HDPE 110 0.501 Laying Completed
5 HDPE 140 0.768 Laying Completed
6 HDPE 160 0.471 Laying Completed
7 HDPE 200 0.194 Laying Completed
HSC Connection
Sno. Total Nos.
1 402
Other Details
2.43
0.00
2.38
16-Apr-2024
10-Feb-2026