Project Completion Certificate (Ground Water)
Scheme ID: 20009954 Name of Scheme: SAMRAHO No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3320 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 28-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 300X150 24.04/167.31 SEMRAHO 25.612399 82.396723
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-15 HP 700/47 SEMRAHO 25.612399 82.396723
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/12 SEMRAHO 25.612538 82.397273
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 160 0.027
2 HDPE PIPE PN-6 140 0.036
3 HDPE PIPE PN-6 110 0.341
4 HDPE PIPE PN-6 90 0.679
5 HDPE PIPE PN-6 75 2.508
6 HDPE PIPE PN-6 63 14.696
HSC Connection
Sno. Total Nos.
1 468
Other Details
2.57
2.40
2.11
28-Feb-2025
01-Mar-2025