| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20008861 | Name of Scheme: Tajupur | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3680 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Jul-2023 | Actual Date of Completion (Capex): 16-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24 / 49.87 | Tajupur | 26.37769243 | 82.66308565 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL / 14 mtr | Tajupur | 26.4471563 | 82.87033312 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 20 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 9.668 | |
| 2 | HDPE PN-6 | 75 | 0.387 | |
| 3 | HDPE PN-6 | 90 | 1.702 | |
| 4 | HDPE PN-6 | 110 | 0.961 | |
| 5 | HDPE PN-6 | 140 | 1.38 | |
| 6 | HDPE PN-6 | 200 | 0.274 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 440 |