| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20008676 | Name of Scheme: Manikpur | No. of Villages: 5 | No. of Habitation Covered: 5 |
| Total Population Covered: 4050 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Jan-2022 | Actual Date of Completion (Capex): 16-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.2 /61.21 | Manikpur | 26.4060282 | 82.34703315 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 850 LPM | Manikpur | 26.4060282 | 82.34703315 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL / 18 mtr | Manikpur | 26.4060282 | 82.34703315 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 20 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN-6 | 63 | 14.823 | |
| 2 | HDPE-PN-6 | 75 | 2.12 | |
| 3 | HDPE-PN-6 | 90 | 0.841 | |
| 4 | HDPE-PN-6 | 110 | .555 | |
| 5 | HDPE-PN-6 | 140 | 1.43 | |
| 6 | HDPE-PN-6 | 160 | .912 | |
| 7 | HDPE-PN-6 | 200 | 1.138 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 596 |