Project Completion Certificate (Ground Water)
Scheme ID: 20000767 Name of Scheme: BHAINSWAL WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 9789 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 05-Mar-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200 MM SLOTTED 60 MTR OHT CAMPUS 29.51543 77.31906
2 300 MM PLAIN 120 MTR OHT CAMPUS 29.51543 77.31906
3 200 MM PLAIN 120 MTR OHT CAMPUS 29.51543 77.31906
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25 HP 950 LPM/ 53 M OHT CAMPUS 29.51543 77.31906
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 CONCRETE 250 KL/ 12 MTR NEW OHT CAMPUS 29.51543 77.31906
2 CONCRETE 250 KL / 15 MTR OLD OHT CAMPUS 29.51543 77.31906
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 200 60
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100 HDPE 63 20.036
2 PN-6 PE100 HDPE 90 3.697
3 PN-6 PE100 HDPE 110 0.708
4 PN-6 PE100 HDPE 140 0.392
5 PN-6 PE100 HDPE 160 0.336
6 PN-6 PE100 HDPE 180 0.382
HSC Connection
Sno. Total Nos.
1 1614
Other Details
74595100.00
73965000.00
58245000.00
05-Mar-2024
05-Mar-2024