| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000767 | Name of Scheme: BHAINSWAL WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 9789 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Mar-2023 | Actual Date of Completion (Capex): 05-Mar-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 MM SLOTTED | 60 MTR | OHT CAMPUS | 29.51543 | 77.31906 |
| 2 | 300 MM PLAIN | 120 MTR | OHT CAMPUS | 29.51543 | 77.31906 |
| 3 | 200 MM PLAIN | 120 MTR | OHT CAMPUS | 29.51543 | 77.31906 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 25 HP | 950 LPM/ 53 M | OHT CAMPUS | 29.51543 | 77.31906 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONCRETE | 250 KL/ 12 MTR | NEW OHT CAMPUS | 29.51543 | 77.31906 |
| 2 | CONCRETE | 250 KL / 15 MTR | OLD OHT CAMPUS | 29.51543 | 77.31906 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 200 | 60 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100 HDPE | 63 | 20.036 | |
| 2 | PN-6 PE100 HDPE | 90 | 3.697 | |
| 3 | PN-6 PE100 HDPE | 110 | 0.708 | |
| 4 | PN-6 PE100 HDPE | 140 | 0.392 | |
| 5 | PN-6 PE100 HDPE | 160 | 0.336 | |
| 6 | PN-6 PE100 HDPE | 180 | 0.382 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1614 |