Project Completion Certificate (Ground Water)
Scheme ID: 20000046 Name of Scheme: SUGAWAN No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 5400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 05-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26.01 M/ 117.85 M SUGAWAN 27.25981 80.054373
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.200 M³ per Min /47 Mtr SUGAWAN 27.25981 80.054373
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 20 Mtr SUGAWAN 27.259809 80.054458
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02034
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.6362
2 HDPE Pipe PN-6, Class PE-100 75 5.6421
3 HDPE Pipe PN-6, Class PE-100 90 3.9542
4 HDPE Pipe PN-6, Class PE-100 110 1.3833
5 HDPE Pipe PN-6, Class PE-100 125 0.6278
6 HDPE Pipe PN-6, Class PE-100 140 2.9482
7 HDPE Pipe PN-6, Class PE-100 160 1.3976
8 HDPE Pipe PN-6, Class PE-100 200 0.965
HSC Connection
Sno. Total Nos.
1 794
Other Details
4.47
0.00
4.32
04-Aug-2023
25-Dec-2024