Project Completion Certificate (Ground Water)
Scheme ID: 20000043 Name of Scheme: THAMARWA No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3630 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 12-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.02 M/ 114.24 M THAMARWA 27.517808 80.239187
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /43 Mtr THAMARWA 27.517808 80.239187
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 14 Mtr THAMARWA 27.51776 80.23879
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01636
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.893
2 HDPE Pipe PN-6, Class PE-100 75 1.941
3 HDPE Pipe PN-6, Class PE-100 90 0.715
4 HDPE Pipe PN-6, Class PE-100 110 0.625
5 HDPE Pipe PN-6, Class PE-100 125 0.184
6 HDPE Pipe PN-6, Class PE-100 140 0.572
7 HDPE Pipe PN-6, Class PE-100 160 0.197
HSC Connection
Sno. Total Nos.
1 451
Other Details
2.44
0.00
2.29
11-Jul-2023
24-Dec-2024