| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000037 | Name of Scheme: Baragaon | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 6300 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Apr-2023 | Actual Date of Completion (Capex): 19-Apr-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.320 | |
| 2 | HDPE | 75 | 4.84 | |
| 3 | HDPE | 90 | 2.288 | |
| 4 | HDPE | 110 | 1.304 | |
| 5 | HDPE | 140 | 2.215 | |
| 6 | HDPE | 180 | 2.506 | |
| 7 | HDPE | 200 | 1.579 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1116 |