Project Completion Certificate (Ground Water)
Scheme ID: 20000037 Name of Scheme: Baragaon No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 6300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 19-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.320
2 HDPE 75 4.84
3 HDPE 90 2.288
4 HDPE 110 1.304
5 HDPE 140 2.215
6 HDPE 180 2.506
7 HDPE 200 1.579
HSC Connection
Sno. Total Nos.
1 1116
Other Details
4.47
4.47
4.35
14-Sep-2023
24-Dec-2024