S.No Scheme ID Scheme Name Financial Year Scheme Type Scheme Status District Name Block Name Panchayat Name IMIS Village Code Village Name IMIS JN17
Estimated Cost(Lacs) Expenditure(Lacs) Expenditure(%) Scheme Status Functional(%) Physical Completion(%) Financial Completion Sanction Cost Excluding Centage(Lacs)[Including all taxes] Agreement Cost(Lacs)[Including GST] Release Amt(Lacs)[Including all taxes] Expenditure(Lacs)[Including all taxes] Liability(Lacs)(optional) Scheme Type      Additional Information     
1 702331 Ajyora Pipe Water Supply Scheme 2003-2004 PWS Completed Kannauj Umarda Ajyora 419459 Ajyora 13.21000 0.00000 0% Functional 100.00 100.00 Yes 11.11000 11.11000 11.11000 11.11000 0.00000 QPV scheme financial closed
2 8366423 Alampur W/S 2015-2016 PWS Completed Kannauj Talgram RAIPUR 637481 Raipur 125.06000 0.00000 0% Functional 100.00 100.00 No 111.77000 111.75000 111.77000 75.57000 0.00000 AEDP The work of Alampur P.Y. was done through Package-3. in Package-3 Four schemes 1- Alampur 2- Induiyaganj 3- Bhudha and 4- Tamiyamau were included and contract no.55/SE/2015-16 was formed. Under the contract an advance of Rs. 15495573.00 is outstanding and a bill of Rs. 1217018.00 is pending for adjustment at Alampur.
3 6274857 Almapur Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Umarda Sikrori 419387 Alampur 82.47000 6.00000 7% Functional 100.00 100.00 Yes 73.30000 73.28000 73.30000 73.28000 0.00000 AEDP
4 6267143 Amolar Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Talgram Amolar 418920 Amolar 515.67000 1.00000 0% Functional 100.00 100.00 Yes 510.47000 510.47000 510.47000 510.47000 0.00000 AEDP scheme financial closed
5 7364713 ANAUGI NRWSP PWS SCHEME 2015 16 2015-2016 PWS Completed Kannauj Jalalabad Anaugi 419123 Anaugi 188.91000 188.91000 100% Functional 100.00 100.00 Yes 168.86000 168.86000 168.86000 168.86000 0.00000 NRDWP scheme financial closed
6 6267130 Anaugi Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Jalalabad Anaugi 419123 Anaugi 188.91000 0.00000 0% Functional 0.00 0.00 No 0.00000 0.00000 0.00000 0.00000 0.00000 DUPLICATE
7 7348986 ASAULIYA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Asaulia 418921 Asaulia 0.17000 0.00000 0% Functional 100.00 100.00 Yes 153.82000 153.36000 153.82000 89.07000 0.00000 AEDP
8 6922991 Bahosi Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Bhadosi 419446 Bahosi 303.33000 0.00000 0% Functional 100.00 100.00 Yes 270.43000 269.08000 269.08000 269.08000 0.00000 AEDP
9 7352647 BAMRAULI PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Bamrauli 418966 Bamrauli 1.52000 0.00000 0% Functional 100.00 100.00 No 136.19000 136.15000 136.19000 81.67000 0.00000 SRDWP The work of Bamrauli P.Y. was done through Package-8. in Package-8 Four schemes 1- Kishanpur 2- Ranwan 3- Bamrauli and 4- Musafirpur were included and contract no. 52/SE/2015-16 was formed. Under the contract an advance of Rs. 6241641.00 is outstanding. Approx rs 3.2 lacs is required for tax adjustment of bills and advances.
10 7628398 Barai pws scheme 2015-2016 PWS Completed Kannauj Talgram Tilak Sarai 418952 Barai 83.60000 0.00000 0% Functional 100.00 100.00 No 74.89000 74.82000 74.89000 63.85000 0.00000 AEDP The work of Barai P.Y. was done through Package-10. in Package-10 Six schemes 1- Salempur 2- Pukhrawan 3- Neknampur 4- Barai 5- Gadnapur Kazi and 6- Mawai were included and contract no. 59/SE/2015-16 was formed. Under the contract an advance of Rs. 956361.00 is outstanding.
11 6922915 Belamau Saraiya Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Belamau 419367 Belamau 367.56000 0.00000 0% Functional 100.00 100.00 No 328.16000 328.16000 328.16000 228.00000 0.00000 AEDP Under the Scheme an advance of Rs. 6516678.00 is outstanding
12 8040425 BHARAULI SIRKANEPUR 2016-2017 PWS Completed Kannauj Chhibramau Bharauli Sirkanipur 418787 Bharauli Sirkanipur 192.25000 0.00000 0% Functional 100.00 100.00 Yes 171.15000 170.29000 171.15000 153.69000 0.00000 SRDWP
13 7348838 BHURAHA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Maura 418972 Maura 0.14000 0.00000 0% Functional 100.00 100.00 No 128.23000 128.20400 128.23000 76.70000 0.00000 AEDP The work of Bhuraha P.Y. was done through Package-3. in Package-3 Four schemes 1- Alampur 2- Induiyaganj 3- Bhudha and 4- Tamiyamau were included and contract no.55/SE/2015-16 was formed. Under the contract an advance of Rs. 15495573.00 is outstanding and a bill of Rs. 2315117.00 is pending for adjustment at Bhuraha.
14 7352710 BIRAULI PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Birauli 418969 Birauli 0.12000 0.00000 0% Functional 100.00 100.00 Yes 102.95000 102.84700 102.84700 102.84700 0.00000 AEDP
15 6274850 Brahimpur Nijampur Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Talgram Birahimpur Nizampur 418968 Birahimpur Nizampur 201.15000 35.16000 17% Functional 100.00 100.00 Yes 195.61000 195.61000 195.61000 195.61000 0.00000 AEDP Scheme Financial Closed
16 7349967 CHANDPURA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Chand Pura 418937 Chand Pura 0.13000 0.00000 0% Functional 100.00 100.00 Yes 118.16000 118.04000 118.16000 108.84000 0.00000 AEDP
17 6267135 Daipur Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Kannauj Mitrasenpur 419226 Mitrasain Pur 98.56000 0.00000 0% Functional 100.00 100.00 Yes 87.60000 87.60000 87.60000 87.60000 0.00000 NRDWP Scheme Financial Closed
18 6274852 Dariyapur Chandai Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Kannauj DARYAPUR CHANDAI 419302 DARYAPUR CHANDAI 103.50000 8.45000 8% Functional 100.00 100.00 Yes 92.44000 92.34000 92.34000 92.34000 0.00000 AEDP
19 7628169 Devdharapur Pws scheme 2015-2016 PWS Completed Kannauj Kannauj Khajuha 419280 Khajuha 213.83000 0.00000 0% Functional 100.00 100.00 Yes 193.88000 193.40000 193.88000 167.04000 0.00000 AEDP
20 2759591 Dudwa Buzurg Pipe Water Supply Scheme 2009-2010 PWS Completed Kannauj Talgram Dundwa Buzurg 418946 Dundwa Buzurg 213.80000 0.00000 0% Functional 100.00 100.00 Yes 199.56000 199.56000 199.56000 155.74000 0.00000 QPV
21 6267136 Faghua Pipe Water supply Scheme 2011-2012 PWS Completed Kannauj Kannauj Faguha 419238 Faguha 122.24000 0.00000 0% Functional 100.00 100.00 Yes 109.51000 109.51000 109.51000 109.51000 0.00000 QPV SCHEME FINANCIAL CLOSED
22 1939523 Fatehpur Kapoorpur PWS 2008-2009 PWS Completed Kannauj Umarda Fatehpur Kapoorapur 419366 Fatehpur Kapoorapur 50.00000 0.00000 0% Functional 100.00 100.00 Yes 34.67000 34.67000 34.67000 34.67000 0.00000 QPV
23 7349979 GADNAPUR KAJI PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Gadnapur Kazi 418930 Gadnapur Kazi 1.18000 0.00000 0% Functional 100.00 100.00 No 105.09000 104.98400 105.09000 92.45000 0.00000 AEDP The work of Gadnapur Kazi P.Y. was done through Package-10. in Package-10 Six schemes 1- Salempur 2- Pukhrawan 3- Neknampur 4- Barai 5- Gadnapur Kazi and 6- Mawai were included and contract no. 59/SE/2015-16 was formed. Under the contract an advance of Rs. 956361.00 is outstanding.
24 7348978 GANDHAULIYA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Gandhaulia 418934 Gandhaulia 0.13000 0.00000 0% Functional 100.00 100.00 Yes 116.79000 116.44000 116.79000 71.02000 0.00000 AEDP
25 7348992 GANGA GANJ GURAULI PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Ganga Ganj Gurauli 418936 Jhusi Nagar 0.15000 0.00000 0% Functional 100.00 100.00 No 131.25000 131.23000 131.23000 76.50000 0.00000 AEDP The work of Ganga Ganj Gurauli P.Y. was done through Package-1. in Package-1 Five schemes 1- Malikpur 2- Raura 3- Amrauli 4- Ganga Ganj Gurauli and 5- Balarpur were included and contract no.54/SE/2015-16 was formed. Under the contract an advance of Rs. 9411559.00 is outstanding and a bill of Rs. 5471391.00 is pending for adjustment at Ganga Ganj Gurauli.
26 6266506 Gangdharapur Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Kannauj Gangdharapur 419203 Gangdharapur 115.85000 0.00000 0% Functional 100.00 100.00 Yes 103.55000 103.55000 103.55000 103.55000 0.00000 NRDWP scheme financial closed
27 6267129 Gauriyapur Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Jalalabad Gauriapur 419124 Gauriapur 100.03000 0.00000 0% Functional 100.00 100.00 Yes 89.51000 89.51000 89.51000 89.51000 0.00000 NRDWP scheme financial closed
28 6267133 Ghamaichmau Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Kannauj Ghamaichmau 419204 Ghamaichmau 113.65000 0.00000 0% Functional 100.00 100.00 Yes 101.59000 101.59000 101.59000 101.59000 0.00000 NRDWP scheme financial closed
29 6267131 Gowa Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Kannauj Gowa 419197 Gowa 93.13000 0.00000 0% Functional 100.00 100.00 Yes 83.24000 83.23000 83.23000 83.23000 0.00000 NRDWP
30 7349941 GUGURAPUR BANGAR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Gughrapur Gugrapur Banger 419130 Gugrapur Banger 4.40000 0.00000 0% Functional 100.00 100.00 No 392.36000 392.32000 392.36000 176.73000 0.00000 AEDP The work of Gugurapur Banger P.Y. was done through Package-12. in Package-12 Three schemes 1- Mehndipur 2- Bansramau and 3- Gugurapur Banger were included and contract no. 53/SE/2015-16 was formed. Under the contract an advance of Rs. 18552410.00 is outstanding.
31 702585 Gurauli Pipe Water Supply Scheme 2006-2007 PWS Completed Kannauj Umarda Gurauli 419457 Gurauli 25.90000 0.00000 0% Functional 100.00 100.00 Yes 23.02000 23.02000 23.02000 23.02000 0.00000 QPV scheme financial closed
32 6687443 Hareipur Pipe Water Supply Scheme 2008-2009 PWS Completed Kannauj Umarda Hareipur 419455 Hareipur 81.45000 0.00000 0% Functional 100.00 100.00 Yes 81.44000 81.24000 81.44000 80.47000 0.00000 NRDWP
33 6687441 Hissamuddinpur Pipe Water Supply Scheme 2007-2008 PWS Completed Kannauj Umarda HINSAMUDDIN PUR 419461 HISAMUDDIN PUR 20.90000 0.00000 0% Functional 100.00 100.00 Yes 19.77000 19.73000 19.73000 19.73000 0.00000 NRDWP
34 7349006 INDUIYAGANJ PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Induia Ganj 418923 Induia Ganj 1.21000 0.00000 0% Functional 100.00 100.00 No 197.56000 197.52000 197.56000 124.63000 0.00000 AEDP The work of Induiyaganj P.Y. was done through Package-3. in Package-3 Four schemes 1- Alampur 2- Induiyaganj 3- Bhudha and 4- Tamiyamau were included and contract no.55/SE/2015-16 was formed. Under the contract an advance of Rs. 15495573.00 is outstanding and a bill of Rs. 3350652.00 is pending for adjustment at Induiyaganj.
35 6327584 Jalalabad Pipe Water Supply Scheme 2010-2011 PWS Completed Kannauj Jalalabad Jalalabad 419102 Jalalabad 144.92000 0.00000 0% Functional 100.00 100.00 Yes 135.78000 135.50000 135.50000 135.50000 0.00000 NRDWP
36 6689133 Jalalpur Panwara Pipe Water Supply Scheme 1978-1979 PWS Completed Kannauj Kannauj Sarontop 419283 Sarontop 22.01000 0.00000 0% Functional 100.00 100.00 Yes 19.56000 19.56000 19.56000 19.56000 0.00000 NRDWP
37 7349028 JAWAMARDPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Chhibramau Jawamardpur 418804 Jawamardpur 0.12000 0.00000 0% Functional 100.00 100.00 No 104.84000 104.84000 104.84000 56.09000 0.00000 AEDP The work of Jawamardpur P.Y. was done through Package-13. in Package-13 Three schemes 1- Kidhina 2- Chaura Chadpur and 3- Jawamardpur were included and contract no.57/SE/2015-16 was formed. Under the contract an advance of Rs. 16222573.00 is outstanding and a bill of Rs. 4318102.00 is pending for adjustment at Jawamardpur.
38 6922605 Kalshan Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Haseran Kalsan 419318 Kalsan 656.48000 5.00000 1% Functional 100.00 100.00 No 585.19000 585.19000 585.19000 532.75000 0.00000 AEDP Under the Scheme an advance of Rs. 3416178.00 is outstanding
39 6922877 Karnauli Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Kanouli 419443 Kanouli 242.37000 0.00000 0% Functional 100.00 100.00 No 216.18000 216.18000 216.18000 136.08000 0.00000 AEDP Under the Scheme an advance of Rs. 2203264.00 is outstanding
40 6273246 Khairnagar Pipe water Supply scheme 2013-2014 PWS Completed Kannauj Umarda Khair Nagar 419456 Khair Nagar 494.37000 38.90000 8% Functional 100.00 100.00 No 439.92000 439.90000 439.92000 418.44000 0.00000 AEDP Under the Scheme an advance of Rs. 2000000.00 is outstanding
41 6922750 Khama Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Khama 419425 Khama 109.84000 2.00000 2% Functional 100.00 100.00 Yes 98.25000 98.25000 98.25000 98.25000 0.00000 NRDWP scheme closed
42 6267149 Khanpur Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Umarda Khanpur 419472 Khanpur 408.33000 0.35000 0% Functional 100.00 100.00 No 363.36000 363.36000 363.36000 355.96000 0.00000 AEDP Under the Scheme an advance of Rs. 700000.00 is outstanding
43 6267142 Khubiriyapur Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Chhibramau Khubaria Pur 418821 Khubaria Pur 452.38000 0.50000 0% Functional 100.00 100.00 Yes 457.37000 457.37000 457.37000 457.37000 0.00000 AEDP scheme closed
44 7349970 KISHANPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Kishan Pur 418927 Kishan Pur 0.14000 0.00000 0% Functional 100.00 100.00 No 125.77000 125.74400 125.77000 72.89000 0.00000 AEDP The work of Kishanpur P.Y. was done through Package-8. in Package-8 Four schemes 1- Kishanpur 2- Ranwan 3- Bamrauli and 4- Musafirpur were included and contract no. 52/SE/2015-16 was formed. Under the contract an advance of Rs. 6241641.00 is outstanding.
45 7349033 KUDHINA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Umarda KUDIHNA 419453 Kudihna 4.86000 0.00000 0% Functional 100.00 100.00 No 433.75000 433.75000 433.75000 273.58000 0.00000 AEDP The work of Kudhina P.Y. was done through Package-13. in Package-13 Three schemes 1- Kidhina 2- Chaura Chadpur and 3- Jawamardpur were included and contract no.57/SE/2015-16 was formed. Under the contract an advance of Rs. 16222573.00 is outstanding and a bill of Rs. 9006906.00 is pending for adjustment at Kudhina.
46 7628459 LADAITA PWS SCHEME 2015-2016 PWS Completed Kannauj Chhibramau Ladaita 418800 Ladaita 217.48000 0.00000 0% Functional 100.00 100.00 Yes 193.32000 191.38600 193.32000 180.40000 0.00000 SRDWP
47 6923000 Lakh Pipe water Supply Scheme 2014-2015 PWS Completed Kannauj Haseran Lakh 419320 Lakh 373.95000 0.00000 0% Functional 100.00 100.00 No 333.78000 333.78000 333.78000 328.49000 0.00000 AEDP Under the Scheme an advance of Rs. 2185400.00 is outstanding
48 7348853 LALPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Lalpur 418990 Lalpur 0.13000 0.00000 0% Functional 100.00 100.00 Yes 112.16000 111.82300 112.16000 67.54000 0.00000 AEDP
49 7348967 LARPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Larpur 418989 Larpur 1.77000 0.00000 0% Functional 100.00 100.00 Yes 157.85000 157.45000 157.85000 141.56000 0.00000 AEDP
50 6923019 Madhpura Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Haseran MARHPURA 419317 MARHPURA 657.52000 0.00000 0% Functional 100.00 100.00 No 586.63000 586.63000 586.63000 472.74000 0.00000 AEDP Under the Scheme an advance of Rs. 5613795.00 is outstanding
51 709242 Madnapur Pipe Water Supply Scheme 2006-2007 PWS Completed Kannauj Umarda MADANAPUR 419433 MADNAPUR 24.18000 0.00000 0% Functional 100.00 100.00 Yes 21.49000 21.49000 21.49000 21.49000 0.00000 QPV scheme closed
52 7628569 MAHAMOODPUR KHAS PWS SCHEME 2015-2016 PWS Completed Kannauj Chhibramau Mahmoodpur Khas 418889 Mahmoodpur Khas 171.55000 0.00000 0% Functional 100.00 100.00 Yes 153.04000 152.66000 152.66000 152.66000 0.00000 SRDWP
53 7349013 MAHONA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram MAHONA 418975 Jahangir Pur 0.15000 0.00000 0% Functional 100.00 100.00 No 130.61000 130.41400 130.61000 98.77000 0.00000 AEDP The work of Mahona P.Y. was done through Package-7. in Package-7 Four schemes 1- Sarai Daulat 2- Rautamai 3- Mahona and 4- Siluapur were included and contract no. 50 /SE/2015-16 was formed. Under the contract an advance of Rs. 3881070.00 is outstanding.
54 6327567 Matauli Pipe Water Supply Scheme 2010-2011 PWS Completed Kannauj Jalalabad MATOULI 419126 MATOULI 127.56000 0.00000 0% Functional 100.00 100.00 Yes 119.27000 119.27000 119.27000 119.27000 0.00000 NRDWP
55 7348998 MAVAI PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Jalalabad Mabai Rihayak 419140 Mabai Rihayak 0.08000 0.00000 0% Functional 100.00 100.00 Yes 68.30000 68.30000 68.30000 68.30000 0.00000 AEDP
56 6267138 Meghauli Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Chhibramau MIDHAULI 418791 Mighauli 487.59000 5.00000 1% Functional 100.00 100.00 Yes 433.89000 433.89000 433.89000 433.89000 0.00000 AEDP
57 6922767 Mirgavan Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Jalalabad Mirgawan 419108 Mirgawan 345.13000 2.00000 1% Functional 100.00 100.00 Yes 308.64000 308.64000 308.64000 294.01000 0.00000 AEDP
58 7352774 MUNDALA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Mundala 418977 Mundala 0.16000 0.00000 0% Functional 100.00 100.00 Yes 146.82000 146.67300 146.82000 129.36000 0.00000 AEDP
59 7352665 MUSAFIR PUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Musafir Pur 418980 Ayub Pur 0.15000 0.00000 0% Functional 100.00 100.00 No 133.39000 133.36300 133.39000 62.98000 0.00000 AEDP The work of Musafirpur P.Y. was done through Package-8. in Package-8 Four schemes 1- Kishanpur 2- Ranwan 3- Bamrauli and 4- Musafirpur were included and contract no. 52/SE/2015-16 was formed. Under the contract an advance of Rs. 6241641.00 is outstanding.
60 6274856 Nadasia Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Jalalabad Nandsia 419125 Nandsia 128.90000 22.75000 18% Functional 100.00 100.00 Yes 133.20000 133.20000 133.20000 133.20000 0.00000 AEDP scheme closed
61 6922843 Nademau Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Haseran Nademau 419315 Haibatpur 716.98000 0.00000 0% Functional 100.00 100.00 No 639.03000 639.03000 639.03000 625.77000 0.00000 AEDP Under the Scheme an advance of Rs. 1323187.00 is outstanding
62 6267141 Nauli Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Chhibramau Nauli 418834 Nauli 423.06000 1.00000 0% Functional 100.00 100.00 Yes 431.69000 431.69000 431.69000 431.69000 0.00000 AEDP scheme closed
63 7352618 NEKNAM PUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Neknam Pur 418959 Govindpur Urf Koolapur 1.19000 0.00000 0% Functional 100.00 100.00 No 106.03000 106.03000 106.03000 88.70000 0.00000 AEDP The work of Neknampur P.Y. was done through Package-10. in Package-10 Six schemes 1- Salempur 2- Pukhrawan 3- Neknampur 4- Barai 5- Gadnapur Kazi and 6- Mawai were included and contract no. 59/SE/2015-16 was formed. Under the contract an advance of Rs. 956361.00 is outstanding.
64 6274849 Nigoh Khas Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Chhibramau Nigoh Khas 418805 Nigoh Khas 160.73000 23.06000 14% Functional 100.00 100.00 Yes 157.61000 157.61000 157.61000 157.61000 0.00000 AEDP scheme closed
65 6274848 Ouser Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Umarda Auser 419469 Ouser 655.23000 45.00000 7% Functional 100.00 100.00 Yes 589.72000 589.72000 589.72000 589.72000 0.00000 AEDP
66 6923035 Paithana Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Paithana 419401 Paithana 309.05000 0.00000 0% Functional 100.00 100.00 No 276.03000 276.03000 276.03000 266.21000 0.00000 AEDP Under the Scheme an advance of Rs. 800000.00 is outstanding
67 7349018 PANGAWAN PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Pangawan 418963 Pangawan 0.42000 0.00000 0% Functional 100.00 100.00 No 373.61000 373.57200 373.61000 249.68000 0.00000 AEDP Runing and Final bill Rs 123.93 lakh pending for adjustment
68 6267132 Paraspur Saraiya Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Jalalabad Paraspur 419174 Paraspur 78.76000 0.00000 0% Functional 100.00 100.00 Yes 70.40000 70.40000 70.40000 70.40000 0.00000 NRDWP scheme closed
69 6922805 Patti Kadera Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Patti 419421 Patti 141.42000 3.00000 2% Functional 100.00 100.00 Yes 126.35000 126.35000 126.35000 126.35000 0.00000 AEDP
70 709144 Patti Tirwa Pipe Water Supply Scheme 2005-2006 PWS Completed Kannauj Jalalabad UTTIMAPUR PATTI 419172 PATTITIRWA 16.20000 0.00000 0% Functional 100.00 100.00 Yes 14.35000 14.35000 14.35000 14.35000 0.00000 QPV scheme closed
71 7352916 PUKHRAWA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Pukhrawan 418964 Pukhrawan 0.16000 0.00000 0% Functional 100.00 100.00 No 141.79000 141.79000 141.79000 115.69000 0.00000 AEDP The work of Pukhrawan P.Y. was done through Package-10. in Package-10 Six schemes 1- Salempur 2- Pukhrawan 3- Neknampur 4- Barai 5- Gadnapur Kazi and 6- Mawai were included and contract no. 59/SE/2015-16 was formed. Under the contract an advance of Rs. 956361.00 is outstanding.
72 6923010 Purarai Pipe Water supply Scheme 2014-2015 PWS Completed Kannauj Haseran POORA RAI 419319 POORA RAI 518.28000 0.00000 0% Functional 100.00 100.00 Yes 462.21000 460.82000 462.21000 409.90000 0.00000 AEDP
73 715953 Purwa Mahtay Pipe Water Supply Scheme 2005-2006 PWS Completed Kannauj Umarda MAHATE PURWA 419431 PURWA MANNTAY 22.34000 0.00000 0% Functional 100.00 100.00 Yes 19.87000 19.87000 19.87000 19.87000 0.00000 NRDWP
74 6273254 Rampur Majhila Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Umarda RAMPURMAGHILA 419445 RAMPUR MAJHILA 783.91000 12.47700 2% Functional 100.00 100.00 Yes 697.58000 697.58000 697.58000 639.61000 0.00000 AEDP
75 7352908 RANWA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Ranwan 418982 Ranwan 0.24000 0.00000 0% Functional 100.00 100.00 No 214.42000 214.38000 214.42000 89.17000 0.00000 AEDP The work of Ranwa P.Y. was done through Package-8. in Package-8 Four schemes 1- Kishanpur 2- Ranwan 3- Bamrauli and 4- Musafirpur were included and contract no. 52/SE/2015-16 was formed. Under the contract an advance of Rs. 6241641.00 is outstanding.
76 7352698 RASULPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Rasulpur 419006 Rasulpur 0.11000 0.00000 0% Functional 100.00 100.00 Yes 99.59000 99.34000 99.59000 97.77000 0.00000 AEDP
77 7348973 RAURA PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Raura 418988 Raura 0.88000 0.00000 0% Functional 100.00 100.00 No 78.96000 78.95000 78.95000 56.45000 0.00000 AEDP The work of Raura P.Y. was done through Package-1. in Package-1 Five schemes 1- Malikpur 2- Raura 3- Amrauli 4- Ganga Ganj Gurauli and 5- Balarpur were included and contract no.54/SE/2015-16 was formed. Under the contract an advance of Rs. 9411559.00 is outstanding and a bill of Rs. 1757909.00 is pending for adjustment at Ganga Ganj Gurauli.
78 6267134 Rudauli Pipe Water Supply Scheme 2011-2012 PWS Completed Kannauj Jalalabad RADOULI 419127 RADOULI 149.01000 0.00000 0% Functional 100.00 100.00 Yes 133.33000 133.33000 133.33000 133.33000 0.00000 NRDWP
79 6922933 Sakrava Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Saurikh Sakrawa 419049 Sakrawa 516.08000 0.00000 0% Functional 100.00 100.00 No 460.25000 460.25000 460.25000 363.62000 0.00000 AEDP Under the Scheme an advance of Rs. 200000.00 is outstanding
80 7352887 SALEMPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Salem Pur 419000 Asafpur Patti 1.66000 0.00000 0% Functional 100.00 100.00 No 148.55000 148.40100 148.55000 108.72000 0.00000 AEDP The work of Salempur P.Y. was done through Package-10. in Package-10 Six schemes 1- Salempur 2- Pukhrawan 3- Neknampur 4- Barai 5- Gadnapur Kazi and 6- Mawai were included and contract no. 59/SE/2015-16 was formed. Under the contract an advance of Rs. 956361.00 is outstanding.
81 7363717 Samdhan PWS Scheme 2015 16 2015-2016 PWS Completed Kannauj Talgram RAIPUR 637481 Raipur 2.21000 0.00000 0% Functional 0.00 0.00 No 0.00000 0.00000 0.00000 0.00000 0.00000 Rurban
82 7348848 SAMGURA BAHADURPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Samgura Bahadur Pur 418994 Samgura Bahadur Pur 0.12000 0.00000 0% Functional 100.00 100.00 No 107.60000 107.33000 107.60000 89.00000 0.00000 AEDP The work of Samgura Bahadurpur P.Y. was done through Package-2. in Package-2 Four schemes 1- Babra Makdumpur 2- Naruiya 3- Sarai Prayag and 4- Samgura Bahadurpur were included and contract no. 49/SE/2015-16 was formed. Under the contract an advance of Rs. 1984099.00 is outstanding.
83 6922949 Sarontop Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Kannauj Sarontop 419283 Sarontop 196.43000 0.00000 0% Functional 100.00 100.00 Yes 175.30000 175.30000 175.30000 175.30000 0.00000 AEDP
84 6922968 Sikrauri Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Sikrori 419387 Alampur 120.92000 0.00000 0% Functional 100.00 100.00 Yes 108.11000 108.11000 108.11000 105.14000 0.00000 AEDP
85 7348981 SILUAPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Silua Pur 419001 Silua Pur 0.14000 0.00000 0% Functional 100.00 100.00 No 124.61000 124.42300 124.61000 101.23000 0.00000 AEDP The work of Siluapur P.Y. was done through Package-7. in Package-7 Four schemes 1- Sarai Daulat 2- Rautamai 3- Mahona and 4- Siluapur were included and contract no. 50 /SE/2015-16 was formed. Under the contract an advance of Rs. 3881070.00 is outstanding.
86 7364240 SIMARIYA NRWSP PWS SCHEME 2015-2016 PWS Completed Kannauj Umarda Simaria 419470 Simaria 435.17000 0.00000 0% Functional 100.00 100.00 No 387.24000 387.24000 387.24000 379.84000 0.00000 NRDWP Under the Scheme an advance of Rs. 700000.00 is outstanding
87 6844810 Simariya PWS 2013-2014 PWS Completed Kannauj Umarda Simaria 419470 Simaria 435.17000 435.17000 100% Non-functional 0.00 0.00 No 0.00000 0.00000 0.00000 0.00000 0.00000 DUPLICATE
88 6687444 Singhpur pipe Water Supply Scheme 2003-2004 PWS Completed Kannauj Umarda Singhpur 419462 Singhpur 19.22000 0.00000 0% Functional 100.00 100.00 Yes 16.15000 16.15000 16.15000 16.15000 0.00000 NRDWP
89 6505226 Solar Based Dual Power Pump Scheme in Kannauj 2013-2014 PWS Completed Kannauj Chhibramau Ahirua Rajaram Pur 418883 Ahirua Rajaram Pur 247.50000 139.50000 56% Functional 100.00 100.00 Yes 206.57000 206.16000 206.57000 165.16000 0.00000 SRDWP
90 7352897 TADAH PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Tadha 418944 Fakar Pur 2.52000 0.00000 0% Functional 100.00 100.00 No 225.20000 225.18000 225.20000 92.61000 0.00000 AEDP The work of Tadah P.Y. was done through Package-5. in Package-5 Two schemes 1- Tera Jaket and 2- Tadah were included and contract no. 51/SE/2015-16 was formed. Under the contract an advance of Rs. 19729668.00 is outstanding.
91 6267145 Talgram (dehat) Pipe water Supply Scheme 2012-2013 PWS Completed Kannauj Talgram Talgram Rural 418949 Talgram Rural 348.54000 1.20000 0% Functional 100.00 100.00 Yes 357.15000 357.15000 357.15000 357.15000 0.00000 AEDP scheme close
92 7348859 TAMIYAMAU PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Tamiya Mau 418948 Samiyamau 0.18000 0.00000 0% Functional 100.00 100.00 No 161.39000 161.36000 161.39000 90.03000 0.00000 AEDP The work of Tamiyamau P.Y. was done through Package-3. in Package-3 Four schemes 1- Alampur 2- Induiyaganj 3- Bhudha and 4- Tamiyamau were included and contract no.55/SE/2015-16 was formed. Under the contract an advance of Rs. 15495573.00 is outstanding and a bill of Rs. 1834013.00 is pending for adjustment at Tamiyamau.
93 7353017 TERA JAKET PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Tera Jaket 418954 Tera Jaket 0.31000 0.00000 0% Functional 100.00 100.00 No 274.99000 274.96000 274.99000 209.34000 0.00000 NRDWP The work of Tera Jaket P.Y. was done through Package-5. in Package-5 Two schemes 1- Tera Jaket and 2- Tadah were included and contract no. 51/SE/2015-16 was formed. Under the contract an advance of Rs. 19729668.00 is outstanding.
94 2759606 Thatiya Pipe Water Supply Scheme 2009-2010 PWS Completed Kannauj Umarda Hareipur 419455 Hareipur 278.00000 0.00000 0% Functional 100.00 100.00 Yes 247.02000 247.02000 247.02000 247.02000 0.00000 AEDP
95 6274854 Tilpai Digsara Pipe Water Supply Scheme 2013-2014 PWS Completed Kannauj Jalalabad Tilpai Digsara 419109 Tilpai Digsara 241.78000 7.00000 3% Functional 100.00 100.00 Yes 215.84000 215.84000 215.84000 215.84000 0.00000 AEDP
96 6922681 Tilsara Pipe Water Supply Scheme 2014-2015 PWS Completed Kannauj Umarda Tilsara 419434 Tilsara 187.32000 5.00000 3% Functional 100.00 100.00 Yes 167.20000 167.20000 167.20000 167.20000 0.00000 AEDP
97 7352873 UMARPUR PAYJAL YOJNA 2015-2016 PWS Completed Kannauj Talgram Umar Pur 418926 Admapur Urf Kapurapur 1.57000 0.00000 0% Functional 100.00 100.00 Yes 140.38000 140.23900 140.38000 130.12000 0.00000 AEDP
98 6267148 Umranpur Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Umarda Umaran 419460 Umaranpur 402.75000 0.20000 0% Functional 100.00 100.00 Yes 396.92000 396.92000 396.92000 396.92000 0.00000 AEDP scheme closedscheme closed
99 6267144 Uncha Pipe Water Supply Scheme 2012-2013 PWS Completed Kannauj Talgram Uncha 418924 Uncha 393.74000 1.00000 0% Functional 100.00 100.00 Yes 396.80000 396.80000 396.80000 396.80000 0.00000 AEDP scheme closed