| 1 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Charkhari |
Bhatewara Kalan |
425944 |
Bhatewara Kalan |
Road Widening[PWD] |
04-Nov-2026 |
07-Nov-2026 |
<p>The 150 mm DI pipeline at Bhatewara Kalan was damaged by the PWD Department during their ongoing work on 04.11.2026, resulting in disruption of water supply to the affected Village Bhatewra kalan The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 10.12.2026.</p> |
| 2 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Charkhari |
Kuroura Dang |
425966 |
Dayalpura |
Damage Village Internal Works |
18-Nov-2026 |
05-Dec-2026 |
<p>The 250 mm DI Pipeline Bamhauri Belradan to dayalpura CWR at Charkhari was damaged by the PWD Department during their ongoing work on 18.11.2026, resulting in disruption of water supply to the affected Village Dayalpura, Kuraura Dang, Majhol, Mithlen Ganj, Jardin Ganj The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 05.12.2026.</p> |
| 3 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Kabrai (mahoba) |
Karahra Kalan |
426017 |
Karahra Kalan |
Damage Village Internal Works |
18-Nov-2026 |
05-Dec-2026 |
<p>The 250 mm DI Pipeline Bamhauri Belradan to dayalpura CWR at Charkhari was damaged by the PWD Department during their ongoing work on 18.11.2026, resulting in disruption of water supply to the affected Village Karhara kalan, Nathoopura The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 05.12.2026.</p> |
| 4 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Charkhari |
Fatehpur |
425960 |
Fatehpur |
Damage Village Internal Works |
18-Nov-2026 |
05-Dec-2026 |
<p>The 250 mm DI Pipeline Bamhauri Belradan to dayalpura CWR at Charkhari was damaged by the PWD Department during their ongoing work on 18.11.2026, resulting in disruption of water supply to the affected Village Fatehpur, Suhjana The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 05.12.2026.</p> |
| 5 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Charkhari |
Bagraun |
425967 |
Bagraun |
Damage Village Internal Works |
18-Nov-2026 |
05-Dec-2026 |
<p>The 250 mm DI Pipeline Bamhauri Belradan to dayalpura CWR at Charkhari was damaged by the PWD Department during their ongoing work on 18.11.2026, resulting in disruption of water supply to the affected Village Baghraun. The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 05.12.2026.</p> |
| 6 |
8009841 |
Salaiya Khalsa Nathupura GOV |
Mahoba |
Panwari |
Gugaura |
425699 |
Gugaura |
Road Widening[PWD] |
04-Nov-2026 |
10-Dec-2026 |
<p>The 150 mm DI pipeline at Bhatewara Kalan was damaged by the PWD Department during their ongoing work on 04.11.2026, resulting in disruption of water supply to the affected Village Gugaura The damaged pipeline needs to be repaired on priority to restore normal water supply. The issue is expected to be resolved by 10.12.2026.</p> |
| 7 |
8009844 |
Shivhar GOV |
Mahoba |
Kabrai (mahoba) |
Sirsi Kalan |
426099 |
Sirsi Kalan |
Road Widening[PWD] |
27-Apr-2026 |
04-Nov-2026 |
<p><span style="background-color: rgb(238, 247, 241); color: rgb(41, 58, 50);">Pipe line Damaged By PWD During the Road Construction work</span></p> |
| 8 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
|
<p>Vide letter No. 3367 dt. 13.11.2026, DM/JHS instructed CE/PWD/JHS to arrange to complete the work on urgent basis</p> |
| 9 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424227 |
Rampura |
Road Widening[PWD] |
16-Jan-2024 |
|
<p>Vide letter No. 3367 dt. 13.11.2026, DM/JHS instructed CE/PWD/JHS to arrange to complete the work on urgent basis</p> |
| 10 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Ninaura |
424230 |
Ninaura |
Road Widening[PWD] |
10-Jun-2024 |
|
<p>Vide letter No. 3367 dt. 13.11.2026, DM/JHS instructed CE/PWD/JHS to arrange to complete the work on urgent basis</p> |
| 11 |
8044758 |
Khatan GOV |
Banda |
Mahua |
Bhawai |
426546 |
Bhawai |
Theft |
22-Oct-2026 |
|
<p>Two no's of batteries and one no of invertor has been stolen from OHT RTU Room, resulting in hampering of SCADA functioning at Bhavai OHT.</p> |
| 12 |
8152383 |
Dhawarra GOV |
Mahoba |
Kabrai (mahoba) |
Pawa |
426048 |
Pawa |
Road Widening[PWD] |
22-Jan-2026 |
16-Nov-2026 |
<p><span style="background-color: rgb(238, 247, 241); color: rgb(41, 58, 50);">Pipe line Pipeline damaged during road widening</span></p> |
| 13 |
8152635 |
Danti GOV and Tubewell Scheme 42 Nos. |
Mirzapur |
Chhanvey |
Kolahi |
477924 |
Bajaha |
Road Widening[PWD] |
27-Oct-2026 |
05-Nov-2026 |
<p>580 mtr Pipeline Damage PWD road Wending </p> |
| 14 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Mulhawa |
478330 |
Mulhawa |
Road Widening[Other] |
01-Jan-2026 |
12-Nov-2026 |
<p>Pipe line damage Due to Railway Over Bridge Construction work, 80% water supply resume balace supply resume after supply after completion railway over bridge approach road.</p> |
| 15 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Mulhawa |
478331 |
Chapur Khurd |
Road Widening[Other] |
01-Jan-2026 |
13-Nov-2026 |
<p>Pipe line damage Due to Railway Over Bridge Construction work, 85% water supply resume balace supply resume after supply after completion railway over bridge approach road.</p> |
| 16 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Aghwar |
478197 |
Aghwar |
Road Widening[Other] |
13-Jan-2026 |
14-Nov-2026 |
<p>Pipe line damage Due to Railway Over Bridge Construction work, 85% water supply resume balace supply resume after supply after completion railway over bridge approach road.</p> |
| 17 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Pakhwaiya |
478121 |
Pakhwaiya |
Road Widening[PWD] |
08-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 18 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Mishradhap |
478120 |
Mishradhap |
Road Widening[PWD] |
08-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 19 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Jagapatti |
478091 |
Jagapatti |
Road Widening[PWD] |
07-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 20 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Jagapatti |
478092 |
Chak Jagapatti |
Road Widening[PWD] |
07-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 21 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Gobraha |
478082 |
Gobraha |
Road Widening[PWD] |
07-Apr-2026 |
20-Nov-2026 |
<p>Pipe line is damaged by PWD(Prantiya khand) Road widening work</p> |
| 22 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Gobraha |
478083 |
Medra |
Road Widening[PWD] |
07-Apr-2026 |
20-Nov-2026 |
<p>Pipe line is damaged by PWD(Prantiya khand) Road widening work</p> |
| 23 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Karsherua |
478074 |
Arjunpur |
Road Widening[PWD] |
15-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 24 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Jagdishpur |
478090 |
Jagdish Patti |
Road Widening[PWD] |
15-Apr-2026 |
31-Oct-2026 |
<p>Pipe line is damaged by PWD(Prantiya khand) Road widening work, new pipe laying work in progress.</p> |
| 25 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Lakhanpur |
478124 |
Lakhanpur |
Road Widening[PWD] |
16-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 26 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Lakhanpur |
478125 |
Sonbersa |
Road Widening[PWD] |
16-Apr-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 27 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Newadhia |
478099 |
Newardhia |
Road Widening[PWD] |
06-Apr-2026 |
15-Nov-2026 |
<p>Pipe line is damaged by PWD Road widening work</p> |
| 28 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Kon |
Newadhia |
478100 |
Damodar Patti |
Road Widening[PWD] |
07-Apr-2026 |
15-Nov-2026 |
<p>Pipe line is damaged by PWD Road widening work</p> |
| 29 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Majhawa |
Bhainsa |
478181 |
Bhainsa |
Road Widening[Other] |
01-Apr-2026 |
07-Nov-2026 |
<p>Pipe line damage Due to Railway Over Bridge Construction work. 90% water supply resume remaining work in progress.</p> |
| 30 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Pahari |
Pahiti |
478472 |
Sagar Semar |
Road Widening[PWD] |
12-May-2026 |
|
<p>DI Pipe damaged due to IOCL pipe line excavation work. Pipe line shifting work in progress.</p> |
| 31 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Arjunpur |
478200 |
Arjunpur |
Road Widening[PWD] |
01-Aug-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 32 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Mahewa |
478319 |
Mahewa |
Road Widening[PWD] |
15-Aug-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 33 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Nagar (city) |
Mahewa |
478320 |
Dunaiya Pandey |
Road Widening[PWD] |
15-Aug-2026 |
|
<p>Pipe line is damaged by PWD(Prantiya khand) Road widening work.70% water supply resume balance work in progress.</p> |
| 34 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Shikhar |
Shilpi |
479224 |
Jogi Bhogi Kala |
Damage Village Internal Works |
16-Mar-2026 |
04-Nov-2026 |
<p>pipe line damaged sewage excavation work by Gram pradhan due 20% water supply disturb this pipe line repairing work inprogress.</p> |
| 35 |
8153275 |
Mahauri GOV and Tubewell Scheme 98 Nos. |
Mirzapur |
Shikhar |
Mawaiya |
479207 |
Prayagpur |
Road Widening[PWD] |
03-Mar-2026 |
|
Pipe line is damaged by PWD(Prantiya khand) Road widening work |
| 36 |
8153338 |
Dhauha GOV |
Mirzapur |
Rajgarh |
Ban Imiliya |
479091 |
Ban Imiliya |
Road Widening[PWD] |
08-Jan-2026 |
06-Nov-2026 |
<p>Water supply has commenced for 40% of Banimiliya, while pipeline laying work is underway for the remaining areas.</p> |
| 37 |
8153338 |
Dhauha GOV |
Mirzapur |
Rajgarh |
Rampur Sakteshgarh |
479124 |
Rampur Sakteshgarh |
Road Widening[PWD] |
08-Jan-2026 |
06-Nov-2026 |
<p>Pipe laying work is being carried out simultaneously as PWD grants road-side clearance at Rampur Sakegarh. 100% water supply will be ensured shortly.</p> |
| 38 |
8153338 |
Dhauha GOV |
Mirzapur |
Rajgarh |
Kothilawa |
479007 |
Kothilawa |
Road Widening[PWD] |
14-Jul-2026 |
06-Nov-2026 |
<p>Pipe laying work is being carried out simultaneously as PWD grants road-side clearance at Kothilwa.100% water supply will be ensured shortly.</p> |
| 39 |
8175013 |
Nagawan GOV |
Sonbhadra |
Nagawa |
Panikap Kala |
480587 |
Shilhat |
Road Widening[PWD] |
29-Jul-2025 |
|
<p><span style="background-color: rgb(238, 247, 241); color: rgb(41, 58, 50);">Pipeline damaged by PWD (PMGSY) during road widening in 5 km stretch containing 160mm, 110mm and 90mm dia HDPE pipe.</span></p> |
| 40 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Babhani |
Bachara |
480968 |
Semariya |
Road Widening[PWD] |
29-Jul-2026 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को लोक निर्माण विभाग द्वारा सड़क चौंड़ीकरण के दौरान 1.870 किमी0 (डीआई पाइप डाया 100, 150 एमएम व एचडीपीई पाइप डाया 63 व 90 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। पूर्व में लोक निर्माण विभाग एवं जल निगम की टीमों द्वारा दिनांक 23.09.2026 संयुक्त निरीक्षण किया गया तथा अनुमानित लागत रू0 34.47 लाख का प्राक्कलन प्रेषित किया गया है। वर्तमान तक धनावंटन अपेक्षित है।</p> |
| 41 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Babhani |
Dumarahar |
480922 |
Dumarahar |
Road Widening[PWD] |
29-Jul-2025 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को लोक निर्माण विभाग द्वारा सड़क चौंड़ीकरण के दौरान 1.493 किमी0 (डीआई पाइप डाया 100 एमएम व एचडीपीई पाइप डाया 63 व 75 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। पूर्व में लोक निर्माण विभाग एवं जल निगम की टीमों द्वारा दिनांक 23.09.2026 संयुक्त निरीक्षण किया गया तथा अनुमानित लागत रू0 16.788 लाख का प्राक्कलन प्रेषित किया गया है। वर्तमान तक धनावंटन अपेक्षित है।</p><p>100mm Dia -220 Rmt</p> |
| 42 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Myorepur |
Naudiha |
480778 |
Naudiha |
Road Widening[RES] |
29-Jul-2025 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को ग्रामीण अभियन्त्रण विभाग (आरईडी) द्वारा सड़क निर्माण के दौरान 1.0902 किमी0 (डीआई पाइप डाया 150, 100 एमएम व एचडीपीई पाइप डाया 63, 75 व 90 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी, बैठक में अधिशासी अभियन्ता, ग्रामीण अभियन्त्रण विभाग (आरईडी) द्वारा अवगत कराया गया है कि जल निगम द्वारा पाइप लाइन मरम्मत हेतु उपलब्ध कराये गये प्राक्कलन धनराशि रू0 15.874 लाख उच्चाधिकारियों को प्रेषित कर दिया गया है। आवश्यक कार्यवाही वर्तमान तक अपेक्षित है।</p> |
| 43 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Myorepur |
Madhuban |
480781 |
Madhuban |
Road Widening[RES] |
29-Jul-2025 |
|
<p>पूर्व में बिछाई गयी (ग्राम मधुबन व खैरटिया टोला) पेयजल पाइप लाइन को ग्रामीण अभियन्त्रण विभाग (आरईडी) द्वारा सड़क निर्माण के दौरान 2.1804 किमी0 (डीआई पाइप डाया 150, 100 एमएम व एचडीपीई पाइप डाया 63, 75 व 90 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। उक्त बैठक में अधिशासी अभियन्ता, ग्रामीण अभियन्त्रण विभाग (आरईडी) द्वारा अवगत कराया गया है कि जल निगम द्वारा पाइप लाइन मरम्मत हेतु उपलब्ध कराये गये प्राक्कलन धनराशि रू0 31.748 लाख उच्चाधिकारियों को प्रेषित कर दिया गया है। आवश्यक कार्यवाही वर्तमान तक अपेक्षित है।</p> |
| 44 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Duddhi |
Dhanaura |
480873 |
Japala |
Road Widening[Other] |
28-Jul-2026 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को कनहर, नहर परियोजना, खण्ड- 5, सिंचाई विभाग द्वारा नहर निर्माण के दौरान 3.662 किमी0 (एचडीपीई पाइप डाया 63 एमएम व डीआई पाइप डाया 100 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। उक्त के क्रम में जल निगम की टीम एवं सिंचाई विभाग की टीम द्वारा पूर्व में दिनांक 23.09.2026 को संयुक्त निरीक्षण कर उक्त समस्या के समाधान हेतु अनुमानित धनराशि रू0 50.36 लाख उपलब्ध कराये जाने हेतु सिंचाई विभाग से अनुरोध किया गया है। वर्तमान तक धनराशि अप्राप्त है।</p> |
| 45 |
8175161 |
Jhilo/ Bijpur GOV |
Sonbhadra |
Babhani |
Bhawar |
480927 |
Bhawar |
Road Widening[PWD] |
29-Jul-2026 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को लोक निर्माण विभाग द्वारा सड़क चौंड़ीकरण के दौरान 1.240 किमी0 (डीआई पाइप डाया 100 एमएम व एचडीपीई पाइप डाया 63 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। पूर्व में लोक निर्माण विभाग एवं जल निगम की टीमों द्वारा दिनांक 23.09.2026 संयुक्त निरीक्षण किया गया तथा अनुमानित लागत रू0 9.78 लाख का प्राक्कलन प्रेषित किया गया है। वर्तमान तक धनावंटन अपेक्षित है।</p> |
| 46 |
8338933 |
Patwadh GOV |
Sonbhadra |
Robertsganj |
Meetapur |
480338 |
Bandhwa |
Road Widening[PWD] |
27-Jul-2024 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को लोक निर्माण विभाग द्वारा रोड़ चौड़ीकरण के दौरान 3.886 किमी0 (जीआई पाइप डाया 50, 65 व 80 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। उक्त के क्रम में जल निगम की टीम एवं लोक निर्माण विभाग की टीम द्वारा दिनांक 10.10.2026 को संयुक्त निरीक्षण कर उक्त समस्या के समाधान हेतु अनुमानित धनराशि रू0 23.94 लाख उपलब्ध कराये जाने हेतु लोक निर्माण विभाग से अनुरोध किया गया है। वर्तमान तक धनराशि अप्राप्त है।ै।</p> |
| 47 |
8338933 |
Patwadh GOV |
Sonbhadra |
Chopan |
Kargara |
480002 |
Kargara |
Road Widening[PWD] |
25-Mar-2025 |
|
<p>पूर्व में बिछाई गयी पेयजल पाइप लाइन को लोक निर्माण विभाग द्वारा रोड़ चौड़ीकरण के दौरान 3.165 किमी0 (जीआई पाइप डाया 50 एमएम व डीआई पाइप डाया 100 एमएम) क्षतिग्रस्त कर दी गयी है, जिसके कारण ग्राम में जलापूर्ति करना सम्भव नही नही हो पा रहा है। उक्त समस्या के समाधान हेतु जिलाधिकारी महोदय, सोनभद्र द्वारा दिनांक 08.10.2026 को सम्बन्धित विभाग के साथ समीक्षा बैठक की गयी एवं निर्देश दिया गया कि आपसी समन्वय स्थापित कर संयुक्त निरीक्षण कर निराकरण करा लिया जाये। उक्त के क्रम में जल निगम की टीम एवं लोक निर्माण विभाग की टीम द्वारा दिनांक 10.10.2026 को संयुक्त निरीक्षण कर उक्त समस्या के समाधान हेतु अनुमानित धनराशि रू0 58.00 लाख उपलब्ध कराये जाने हेतु लोक निर्माण विभाग से अनुरोध किया गया है। वर्तमान तक धनराशि अप्राप्त है।ै।</p> |
| 48 |
8359441 |
Badhai Khurd |
Muzaffarnagar |
Charthawal |
Badhai Khurd |
385002 |
Badhai Khurd |
Power/Electrical Issue |
01-Nov-2026 |
|
<p>Solar cable theft</p> |
| 49 |
8360312 |
Saidpur Kalan |
Muzaffarnagar |
Charthawal |
Saidpur Kalan |
385003 |
Saidpur Kalan |
Power/Electrical Issue |
16-Oct-2026 |
|
<p>Solar cable theft</p> |
| 50 |
8361768 |
BEDKHERI, PAVTI KHURD |
Shamli |
Un |
Bedkheri |
384722 |
Bedkheri |
Theft |
26-Sep-2026 |
|
<p>INVERTAR & BATTERY STOLEN</p> |
| 51 |
8362043 |
LOHARIPUR |
Shamli |
Kandhla |
Loharipur |
384920 |
Loharipur |
Theft |
15-Oct-2026 |
|
<p>Solar cable stolen</p> |
| 52 |
8388533 |
Jamuvava |
Raebareli |
Lalganj |
Jamuwanwa |
417250 |
Jamuwanwa |
Road Widening[RES] |
17-Aug-2026 |
|
<p>PMGSY द्वारा सड़क निर्माण (पुरे मेहरबान से बहाई और चंदाटीकर से मातादीन का पुरवा तक) के दौरान 1300 मीटर पाइपलाइन और 14 FHTC क्षतिग्रस्त हो गए, जिससे जलापूर्ति बाधित हो गई है। जिसकी छतिग्रस्त पाइपलाइन तथा FHTC मरम्मत कराने हेतु - <strong><u>अधिशासी अभियन्ता, उ०प्र० जल निगम (ग्रामीण)</u></strong> द्वारा पत्रांक 1551/डब्लू-2/41, दिनांक 20.07.2026 तथा 1765/डब्लू-2/46, दिनांक 06.08.2026 द्वारा पत्र प्रेषित तथा <strong><u>जिलाधिकारी महोदया</u></strong> द्वारा 267/एस०टी०मु०वि०अ०/2026/27, दिनांक 24.09.2026 द्वारा पाइपलाइन मरम्मत कराने हेतु निर्देशित।</p> |
| 53 |
20006696 |
SHAHPUR QUTUB |
Aligarh |
Lodha |
Shahpur Kutub |
394549 |
Shahpur Kutub |
Tullu Pump |
16-Nov-2026 |
|
<p>Found approx 25 House hold Tap's Person are using tullu pump at their home.resultant further supply interrupted.</p> |
| 54 |
20013491 |
Anapur Water Supply Scheme |
Amethi |
Gauriganj |
Anapur |
439651 |
Ana Pur |
Road Widening[NHAI] |
10-Jun-2026 |
30-Sep-2026 |
<p>On 17/11/2026, a meeting was held under the chairmanship of the DM, Amethi with officials from Jal Nigam (Gramin) Amethi, PWD, and PWD (NH), along with the executing agencies, regarding the water supply disruption caused by pipeline damage during road widening. It was decided that all disruptions will be resolved and water supply restored by December 20. The executing agencies responsible for the disruption have also agreed to complete the work by December 20.</p> |
| 55 |
20013625 |
JOGRAJPUR VILLAGE WATER SUPPLY SCHEME |
Pilibhit |
Puranpur |
Jograjpur |
405647 |
Jagrajpur |
Theft |
|
|
<p>Inverter & power cables were stolen from the premises</p> |
| 56 |
20013640 |
Dakkhin Gaon Water Supply Scheme |
Amethi |
Shahgarh |
Dakkhin Gaon |
439577 |
Pachhela |
Road Widening[NHAI] |
10-Jul-2026 |
30-Sep-2026 |
<p>On 17/11/2026, a meeting was held under the chairmanship of the DM, Amethi with officials from Jal Nigam (Gramin) Amethi, PWD, and PWD (NH), along with the executing agencies, regarding the water supply disruption caused by pipeline damage during road widening. It was decided that all disruptions will be resolved and water supply restored by December 20. The executing agencies responsible for the disruption have also agreed to complete the work by December 20.</p> |
| 57 |
20022092 |
Kannu Kheda Badhev Village water Supply |
Shamli |
Kairana |
Kandu Khera Badhev |
384795 |
Badhev Kannu Khera |
Theft |
21-Nov-2026 |
|
<p>Solar Cable stolen</p> |
| 58 |
20038577 |
Tandawa nankari Water Supply Scheme |
Barabanki |
Fatehpur |
Tandwa Nankari |
434682 |
Bhawanipur |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>टण्डवा पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1505मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम भवानीपुर के 73 एवं ग्राम देवरिया के 110 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा।</p> |
| 59 |
20038577 |
Tandawa nankari Water Supply Scheme |
Barabanki |
Fatehpur |
Tandwa Nankari |
434681 |
Deoria |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>टण्डवा पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1505मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम भवानीपुर के 73 एवं ग्राम देवरिया के 110 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा।</p> |
| 60 |
20041700 |
Bisain Water Supply Scheme |
Barabanki |
Nindaura |
Bisain |
434428 |
Bisain |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>बिसईं पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1375मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बिसईं के 200 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 61 |
20059210 |
Balloopur & Kyotali Water Supply Scheme |
Barabanki |
Suratganj |
Balloopur |
434874 |
Balloopur |
Road Widening[PWD] |
24-Feb-2026 |
|
<p>बल्लोपुर क्योटलीं पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 2745मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बल्लोपुर के 370 एवं क्योटली के 250 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 62 |
20059210 |
Balloopur & Kyotali Water Supply Scheme |
Barabanki |
Suratganj |
Kyontali |
434873 |
Kyotali |
Road Widening[PWD] |
24-Feb-2026 |
|
<p>बल्लोपुर क्योटलीं पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 2745मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बल्लोपुर के 370 एवं क्योटली के 250 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 63 |
20059837 |
Bada Gaon Water Supply Scheme |
Barabanki |
Nindaura |
Badagaon |
434466 |
Badagaon |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>बड़ागांव पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1645मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बड़ागांव के 475 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएया ।</p> |
| 64 |
20059879 |
Ojhiapur & Dhadhara Water Supply Scheme |
Barabanki |
Nindaura |
Ojhiapur |
434471 |
Ojhiapur |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>ओझियापुर एवं धंधरा पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1637मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम ओझियापुर के 100 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 65 |
20059903 |
Kondri Gopalpur & Baddupur Water Supply Scheme |
Barabanki |
Nindaura |
Baddupur |
434467 |
Baddupur |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>कोडरी गोपालपुर एवं बड्डूपुर पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 1700मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बड्डूपुर के 325 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 66 |
20065217 |
SARESAR, SIRYARI WATER SUPPLY SCHEME |
Amethi |
Jagdishpur |
Saresar |
439239 |
Saresar |
Road Widening[NHAI] |
02-Sep-2026 |
10-Sep-2026 |
<p> दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।
</p> |
| 67 |
20066413 |
babu pur Sharia water supply Scheme |
Amethi |
Jagdishpur |
Babu Pur Sharia |
439233 |
Babu Pur Sharia |
Road Widening[NHAI] |
02-Sep-2026 |
10-Sep-2026 |
<p>दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।</p> |
| 68 |
20066469 |
ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME |
Amethi |
Jagdishpur |
Tetarpur |
439174 |
Tevar Pur |
Road Widening[NHAI] |
02-Sep-2026 |
10-Sep-2026 |
<p> दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।
</p> |
| 69 |
20068313 |
BAHORAKHA WATER SUPPLY SCHEME |
Amethi |
Shahgarh |
Bahorakha |
439615 |
Bahorakha |
Road Widening[NHAI] |
02-Feb-2026 |
10-Sep-2026 |
<p> दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।</p> |
| 70 |
20068436 |
Panjeth Village Water Supply Scheme |
Shamli |
Kairana |
Panjeth |
384784 |
Panjeth |
Theft |
02-Sep-2026 |
|
<p>SOLAR PLATE & VFD STOLEN</p> |
| 71 |
20070499 |
KHAWAJABAREPUR WSS |
Ambedkar Nagar |
Ramnagar |
HISAMUDDINPUR PIPRA |
437977 |
HISAMUDDINPUR PIPRA |
Theft |
30-Mar-2025 |
|
जल
जीवन मिशन परियोजना हिसामुद्दीनपुर पिपरा में चोरी के सम्बन्धमें प्रार्थना पत्र । महदोय,
ग्राम पंचायत हिसामुद्दीनपुर पिपरा में 30/11.2024 की मध्य रात्रि अज्ञात चोरो द्वारा
साइट पर उपस्थित 15 सोलर पैनल 12 पेनिल, 16 एल क्लिट व 30 मीटर डी.सी. केवल
को काटकर चुरा ले गये |
| 72 |
20070877 |
KITIYAWAN WATER SUPPLY SCHEME |
Amethi |
Shahgarh |
Kitiyawan |
439579 |
Kitiyawan |
Road Widening[NHAI] |
02-Feb-2026 |
10-Sep-2026 |
<p>दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।</p> |
| 73 |
20071580 |
Basara Water Supply Scheme |
Barabanki |
Nindaura |
Basara |
434426 |
Basara |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>बसारा पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 2197मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम बसारा के 325 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 74 |
20074430 |
JORDIH |
Shravasti |
Ekona |
Jordih |
443493 |
Jordih |
Road Widening[PWD] |
17-Apr-2026 |
|
Dia-63, Approx Lenth in Mtr-18.
Dia-140, Approx Lenth in Mtr-681.
Dia-180, Approx Lenth in Mtr-798. |
| 75 |
20075321 |
AMARE BHARIYA |
Shravasti |
Ekona |
Amare Bhariya |
443473 |
Ameer Bhariya |
Road Widening[PWD] |
22-Apr-2026 |
|
PWD द्वारा सड़क चौड़ीकरण कार्य के दौरान कई स्थानों पर पाइपलाइनें, वाल्व चैंबर एवं FHTC क्षतिग्रस्त हो गए, जिससे RWS प्रणाली गंभीर रूप से प्रभावित हुई है। |
| 76 |
20076669 |
DULARPUR WATER SUPPLY SCHEME |
Amethi |
Shahgarh |
Dulapur Khurd |
439612 |
Dulapur Khurd |
Road Widening[NHAI] |
10-Jun-2026 |
30-Sep-2026 |
<p>On 17/11/2026, a meeting was held under the chairmanship of the DM, Amethi with officials from Jal Nigam (Gramin) Amethi, PWD, and PWD (NH), along with the executing agencies, regarding the water supply disruption caused by pipeline damage during road widening. It was decided that all disruptions will be resolved and water supply restored by December 20. The executing agencies responsible for the disruption have also agreed to complete the work by December 20.</p> |
| 77 |
20077075 |
BehtaKazi & Jharsawa Water Supply Scheme |
Barabanki |
Nindaura |
Jharsawa |
434477 |
Prempur |
Road Widening[PWD] |
20-Feb-2026 |
|
<p>बेहटाकाजी एवं झरसवां पेयजल योजनान्तर्गत लो0नि0वि0 द्वारा रोड चैड़ीकरण के दौरान पूर्व से सड़क के शोल्डर पर डाली गयी जल जीवन मिशन की 2911मी0 पाइप लाइन क्षतिग्रस्त हो गयी है। वर्तमान में उक्त क्षतिग्रस्त पाइप लाइन पेन्टेड सरफेस के नीचे है जिसके कारण ग्राम प्रेमपुर के 150 परिवारों को जलापूर्ति नही हो पा रही है। दिनांक 19.11.2026 को जिला पेयजल एवं स्वच्छता मिशन की बैठक में जिलाधिकारी महोदय द्वारा लो0नि0वि0 एवं जल निगम (ग्रामीण) द्वारा संयुक्त निरीक्षण कर रिपोर्ट 01 सप्ताह में प्रस्तुत करने हेतु निर्देशित किया गया है। जिसका कार्य प्रगति पर है। उक्त के उपरान्त लो0नि0वि0 से पाइप शिफ्टिंग हेतु धनावंटन पर निर्णय करा लिया जाएगा ।</p> |
| 78 |
20077118 |
MADARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
Kannauj |
Chhibramau |
MADAR PUR |
418909 |
Madar Pur |
Theft |
27-Nov-2026 |
31-Dec-2026 |
<p>अज्ञात व्यक्तियों द्वारा मदारपुर पेयजल योजना में 21 सोलर पैनल चोरी की घटना की गयी है.</p> |
| 79 |
20077118 |
MADARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
Kannauj |
Chhibramau |
MADAR PUR |
418909 |
Madar Pur |
Theft |
27-Nov-2026 |
31-Dec-2026 |
<p>अज्ञात व्यक्तियों द्वारा मदारपुर पेयजल योजना में 21 सोलर पैनल चोरी की घटना की गयी है.</p> |
| 80 |
20077970 |
Chundiyari & Basi Water Supply Scheme |
Shamli |
Un |
Chundyari Basi |
384666 |
Basi |
Theft |
22-Nov-2026 |
|
<p>VFD & SOLAR CABLE STOLAN AT SITE </p> |
| 81 |
20083192 |
PRATPPUR & MAHLA GOV WSS |
Sant Kabeer Nagar |
Santha |
Mahla |
451872 |
Mahala |
Road Widening[PWD] |
10-Feb-2026 |
|
LETTER SUBMITTED TO EE OFFICE |
| 82 |
20083192 |
PRATPPUR & MAHLA GOV WSS |
Sant Kabeer Nagar |
Santha |
Paratap Pur |
451883 |
Paratap Pur |
Road Widening[PWD] |
15-Sep-2025 |
|
LETTER SUBMITTED TO EE |
| 83 |
20085148 |
Karanjot, Santha & Sanda |
Sant Kabeer Nagar |
Santha |
Sanda |
451928 |
Sanda |
Road Widening[PWD] |
15-Nov-2025 |
|
LETTER SUBMITTED TO EE OFFICE |
| 84 |
20085148 |
Karanjot, Santha & Sanda |
Sant Kabeer Nagar |
Santha |
Santha |
451926 |
Santha |
Road Widening[PWD] |
15-Nov-2025 |
|
LETTER SUBMITTED TO EE OFFICE |
| 85 |
20085426 |
Harpur GP WSS |
Sant Kabeer Nagar |
Nathnagar |
Harpur |
452693 |
Harpur |
Road Widening[PWD] |
08-Apr-2026 |
|
3621 Rmt pipeline damaged by PWD department during road construction work. |
| 86 |
20085667 |
GORIYABAD &PURE CHITA WATER SUPPLY SCHEME |
Amethi |
Jamo |
Goriya Bad |
439492 |
Goriya Bad |
Road Widening[NHAI] |
02-Feb-2026 |
10-Sep-2026 |
<p>दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।</p> |
| 87 |
20085670 |
NEWADA KISUNPUR GARH WATER SUPPLY SCHEME |
Amethi |
Shahgarh |
Nawada Kishun Garh |
439591 |
Nawada Kishun Garh |
Road Widening[NHAI] |
02-Feb-2026 |
10-Sep-2026 |
<p>दिनांक <strong>17.11.2026</strong> को जिलाधिकारी, अमेठी की अध्यक्षता में जल निगम (ग्रामीण), अमेठी, लोक निर्माण विभाग (PWD), लोक निर्माण विभाग (NH) के अधिकारियों एवं कार्यदायी संस्थाओं के साथ सड़क चौड़ीकरण के दौरान पाइपलाइन क्षतिग्रस्त होने से उत्पन्न पेयजल आपूर्ति बाधित होने के संबंध में बैठक आयोजित की गई।</p><p>बैठक में निर्णय लिया गया कि पेयजल आपूर्ति से संबंधित सभी व्यवधानों का निराकरण करते हुए <strong>दिनांक 20.12.2026 तक पेयजल आपूर्ति बहाल कर दी जाएगी।</strong> साथ ही, पाइपलाइन क्षतिग्रस्त होने के लिए जिम्मेदार कार्यदायी संस्थाओं द्वारा भी उक्त तिथि तक संबंधित कार्य पूर्ण करने हेतु सहमति व्यक्त की गई।</p> |
| 88 |
20086001 |
HAKEEMPUR GP WSS |
Sant Kabeer Nagar |
Haisar Bazar |
Hakeempur |
452982 |
Hakeempur |
Road Widening[PWD] |
08-Apr-2026 |
|
1255 Rmt pipeline damaged by PWD department during road construction work. |
| 89 |
20086731 |
JAGDEESHPUR GP WSS |
Sant Kabeer Nagar |
Haisar Bazar |
JAGDEESHPUR |
452980 |
Bhikharipur |
Road Widening[PWD] |
08-Apr-2026 |
|
861 Rmt pipeline damaged by PWD department during road construction work. |
| 90 |
20087453 |
HATWA & NATWA GOV WSS |
Sant Kabeer Nagar |
Nathnagar |
Natwa |
452860 |
Natwa |
Road Widening[PWD] |
08-Apr-2026 |
|
287 Rmt pipeline damaged by PWD department during road construction work. |
| 91 |
20088921 |
GOPALPUR |
Shravasti |
Ekona |
Gopalpur |
443476 |
Gopalpur |
Road Widening[PWD] |
28-Apr-2026 |
|
During road widening work by PWD, pipelines, valve chambers and FHTC were damaged at many places. |
| 92 |
20088924 |
CHAINPUR |
Shravasti |
Ekona |
Chainpur |
443491 |
Chainpur |
Road Widening[PWD] |
17-Apr-2026 |
|
During road widening work by PWD, pipelines, valve chambers and FHTC were damaged at many places. |
| 93 |
20089753 |
PURE MASHARAM |
Shravasti |
Ekona |
Pure Masharam |
443495 |
Pure Mansaram |
Road Widening[PWD] |
14-Apr-2026 |
|
During road widening work by PWD, pipelines, valve chambers and FHTC were damaged at many places. |
| 94 |
20093120 |
DHUM BOJHI |
Shravasti |
Jamunaha |
Dhum Bojhi |
443081 |
Dhum Bojhi |
Road Widening[PWD] |
01-May-2026 |
|
Pipelines, valve chambers, and FHTCs have been damaged, as a result of which the RWS has been severely affected. |
| 95 |
20093361 |
DEVARIA GP WSS |
Shahjahanpur |
Bhwalkhera |
DIVRIYA |
681474 |
DIVRIYA |
Theft |
26-Aug-2026 |
|
<p>All solar panels have been stolen from the OHT premises. An order has been placed for a replacement solar system, which will be installed within 15 days, following which the water supply will be restored.</p> |
| 96 |
20094289 |
KHARWANIA KHURD & PADARAHA GOV WATER SUPPLY SCHEME |
Sant Kabeer Nagar |
Nathnagar |
Kharwania Khurd |
452749 |
Kharwania Khurd |
Road Widening[PWD] |
10-Mar-2026 |
|
1218 Rmt pipeline damaged by PWD department during road construction work. |
| 97 |
20097270 |
BELKAR |
Shravasti |
Ekona |
Belkar |
443424 |
Belkar |
Road Widening[PWD] |
07-Jun-2026 |
|
RWS Intrupped due to the Pipe line damaged by PWD |
| 98 |
20097282 |
PARAS RAMPUR_ BISUNAPUR |
Shravasti |
Ekona |
Paras Rampur |
443480 |
Paras Rampur |
Road Widening[PWD] |
17-Apr-2026 |
|
During road widening work by PWD, pipelines, valve chambers and FHTC were damaged at many places. |