SCADA   AUTOMATION   SYSTEM

Sno. District Agency Total No.of Scheme Total No.Of OHT Total Installed SCADA/No.of On Today No.Of SCADA Auto Mode Overall Production water from starting date () Today Production Water () Ground Water Depth () Today Pump Run Hour No.of On Solar On Solar Time
Chlorine Tank One
Full | Empty
Chlorine Tank Two
Full | Empty
Chlorine OHT High Level() OHT Low Level() OHT Level() Pressure Turbidity Voltage RN
Total 3083 3089 8 / 2 2 7496.49 26.80 15.69 0.02 0 0.35 1 / 7 2 / 6 75.51 245.00 212.01 2.39 0.00 186.76 219.16
1 Sitapur Larsen & Toubro Ltd 535 536 1/1 0 396.90 26.80 0.00 0.00 0 0.01 0/1 1/0 0.00 70.01 50.01 2.25 0.00 19.61 0.00
2 Lakhimpur Kheri NCC Ltd. 666 664 1/1 1 6767.36 0.00 0.00 0.02 0 0.17 1/0 1/0 75.51 80.00 71.99 0.14 0.00 75.36 219.16
3 Gorakhpur NCC Ltd. 630 632 2/0 1 332.23 0.00 15.69 0.00 0 0.17 0/2 0/2 0.00 94.99 90.01 0.00 0.00 91.79 0.00
4 Bareilly NCC Ltd. 877 877 3/0 0 0.00 0.00 0.00 0.00 0 0.00 0/3 0/3 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Lucknow NCC Ltd. 375 380 1/0 0 0.00 0.00 0.00 0.00 0 0.00 0/1 0/1 0.00 0.00 0.00 0.00 0.00 0.00 0.00